The Bhanupli–Leh line, including 63.1 km (39.2 mi) long Bhanupli-Barmana (Bilaspur) link[2] and the 489 km (304 mi) long Bilaspur-Manali-Leh link,[3][4] is an under-construction 552.1 km (343.1 mi) long 1,676 mm (5 ft 6 in) wide broad-gauge all-weather electrified railway track connecting Bhanupli in Punjab,[5] to Leh in Ladakh.[2][6][7] Passing through seismic zone IV and V at an elevation of 600 m (2,000 ft) to 5,360 m (17,590 ft) above sea level, this geostrategically important track will reduce travel time from New Delhi to Leh to 10 hours,[3][4] which takes 25–40 hours by road.[8]

Bhanupli–Leh line
Overview
Status
  • Final Location Survey & DPR completed
  • Land acquisition in progress
  • Bhanupli-Bilaspur section under construction
LocalePunjab, Himachal Pradesh and Ladakh, India
Termini
Websitehttp://www.indianrailways.gov.in
Service
ServicesBhanupli–BilaspurSundernagarKulluManaliKeylongLeh
Technical
Line length489 km (304 mi)
Track length489 km (304 mi)
Track gauge1,676 mm (5 ft 6 in)
ElectrificationIn Progress
Highest elevation5,359 m (17,582 ft) at Taglang La
Route map

Ganderbal
Kargil
Leh
Choglamshahr
Sindhughat
Shey
Thicksey
Rabirpora
Chang-Karu
Upshi-Junction
Rumtse
Taglang La
Debring
Pang
Lachalungla
Sarchu
Baralachala
Dharcha
Jispa
Keylong
Tandi
Sissu
Rohtang Hault
Manali
Naggar
Kullu
Bhuntar
Aut
Pandoh
Joginder Nagar (planned)
Mandi
Bilaspur
Jagatkhana
Dharot
Thural
Bhanupli

Significance

edit

The Bhanupali–Leh line (also referred to as the Bilaspur–Manali–Leh line) is a high-altitude, strategic railway project currently under construction in India. Upon completion, it will connect the plains of Punjab and Himachal Pradesh to the union territory of Ladakh. The line is widely regarded as one of the most challenging engineering feats in the history of global rail transport due to its extreme topography and high-altitude logistics.[9] After the Jammu–Baramulla line, the Bhanupli–Leh line will be the most challenging railway project in Indian Railways due to high mountains, a large number of tunnels, high bridges, and severe cold weather.[3]

Geostrategic

edit
Indian Howitzer K9 self-propelled artillery at Ladakh during 2020–2021 China–India skirmishes.

Socioeconomic

edit
9 Stupas at Thikse Monastery.

Beyond its military utility, the line is expected to transform the economy of the Lahaul and Spiti district and Ladakh:

  • Tourism expansion: By providing a safer and more reliable alternative to the treacherous mountain roads, the railway is expected to significantly increase tourist arrivals to Manali, Keylong, and Leh.
  • Agricultural access: Local farmers in the Lahaul and Indus valleys will gain direct access to mainland Indian markets for the export of high-value crops like apples, apricots, and buckwheat.[12]
  • Price stability: All-weather connectivity will help stabilize the prices of essential commodities in Ladakh, which currently skyrocket during the winter months due to the "landlocked" nature of the region.

Engineering

edit
Taglang La, and many other high-altitude mountain passes enroute this line offer several engineering challenges.

The project is set to break several global engineering records:

  • World's highest railway: The station at Tengla (near Taglang La) is projected to be the highest in the world at an altitude of approximately 5,359 metres (17,582 ft), surpassing the current record held by the Tanggula railway station in Tibet.[13]
  • Subterranean infrastructure: Approximately 50% of the 489 km route will be underground. This includes Keylong railway station, which is designed to be India's first station built entirely inside a tunnel.[14]
  • Tunnels and viaducts: The line includes 27 km of continuous tunneling and numerous high-altitude viaducts to bridge deep Himalayan gorges.
  • Environmental and geological challenges: The project faces scrutiny regarding its environmental footprint in the fragile Himalayas. The route passes through high-seismic zones and areas prone to flash floods and landslides. Construction requires advanced seismic bracing and specialized drainage systems to mitigate the risk of tunnel collapses.[15]

Details

edit

Route

edit
Gobind Sagar Reservoir in Bilaspur formed by the Bhakra Dam on the Sutlej river.
Sundar Nagar Lake at Sundar Nagar as part of the Beas-Sutlej River Link project.
Khirganga National Park with the thrillingly bautiful hairpin turn road in the Parvati River Valley near Kullu in Himachal Pradesh.
View of the Bhaga Valley and hairpin turn road from the Shashur Monastery in Keylong.
Lungalacha La with dramatic yellowish-golden hued and needle-like jagged pillar rock formations.
Upshi road junction along the Indus river.
Thikse Monastery, also called the "Mini Potala" due to its resemblance with Lhasa's Potala Palace.

The project has 42 new stations, including 5 between Bhaupali to Barmana (Bilaspur) and 37 stations from Bilaspur to Leh and Sarthang.[16][17]

Features

edit

Bilaspur-Manali-Leh rail line, with a total length of 489 km (304 mi), including the 13 km (8.1 mi) Leh-Sasherthang rail link, will cost ₹99,000 crore (~US$12.4 billion). This includes ₹62,000 crore (~US$7.75 billion) for 62 tunnels totaling 270 km (170 mi) in length, 114 major bridges, and 90 minor bridges.[3] [17] Bilaspur-Leh section will have 124 major bridges, 396 minor bridges, and 52% track passing through 74 tunnels (with 27 km long Keylong tunnel being longer). Since this track passes through sub-zero cold weather, the coaches will be pressurised to maintain oxygen level and will be heated, but there will be no sleeper class seats. Construction includes structure to mitigate landslides, cloudbursts, and avalanches in the 48% section running outside the tunnels.[17]

Construction

edit
Buddha statue at Sindhu Ghat where the annual Sindhu Darshan Festival is held in June.

Funding

edit

According to the 2022 Detailed Project Report (DPR), project cost will exceed ₹1 lakh crore. Total 2200 hectares land, including 572 hectares (26%), will be acquired at the cost of ₹11,500 crore. Bridges and tunnels will cost ₹62,000 crore including the large escape tunnels for ensuring passenger safety during emergencies.[19] The project requires the acquisition of 1,100 ha (11 km2) of land, of which 26% is forest land, at a cost of ₹11,500 crore (~US$8.5 billion). 150 km (93 mi) of approach roads will be constructed.[2]

Sections

edit

In March 2012, Ministry of Railways sent the project to the Planning Commission for appraisal.[20][21] In December 2016, the 498 km (309 mi) the budget of ₹345 crore was approved for carrying out the Final Location Survey (FLS) for Bhanupli–Leh rail,[22] which finally begun in June 2017,[23] and was completed by October 2020.[24] In March 2025, the FSL and subsequent DPR for Bilaspur-Manali-Leh line were complete.[25]

  • Section-0: Bhanupli to Barmana (Bilaspur), 63.1 km (39.2 mi) long link begins at the existing Bhanupli station,
  • Section-1: Barmana to Mandi
  • Section-2: Mandi to Manali
  • Section-3: Manali to Upshi
  • Section-4: Upshi to Leh
  • Section-5: Leh to Sasherthang 13 km (8.1 mi) link, included in the project at the request of the Indian military,[2] and Ministry of Defence had granted final approval in December 2024.[19]

Section-0: Bhanupli to Barmana (Bilaspur), 63.1 km

edit

The construction on this initial section is focused on connecting the existing Bhanupli railway station in the Rupnagar district of Punjab to Barmana in the Bilaspur district of Himachal Pradesh. It has a total track length of 63.1 km (39.2 mi), 20 tunnels totaling 25 km (16 mi), 24 bridges totaling 6 km (3.7 mi), and 2 viaducts totaling 2 km (1.2 mi).[2][16][26]

Section-1: Barmana (Bilaspur) to Mandi

edit

In May 2022, this section commenced with land acquisition between Barmana and Mandi.[27]

edit

Originally, a couple of further extensions from Leh also were planned to be constructed at a later time. However, in 2023 these were officially declared to be "shelved due to low traffic projection".[3] They comprised the following.

  • 1. Srinagar-Kargil-Leh line, 480 km (300 mi), a Rs 55,896 crore project.,[3][28][29] survey done, DPR on hold as of 2025.
    • 1.1. Leh-Kargil rail line, 210 km (130 mi).[28]
    • 1.2. Kargil-Srinagar rail line, 225 km (140 mi).[28]
  • 2. Pathankot-Leh line, 664 km (413 mi), Rs 70,308 crore project,[3] survey done, DPR being prepared in 2025.

See also

edit

References

edit
  1. "Bhanupli Railway Station Timeline - Railway Enquiry".
  2. 1 2 3 4 5 6 7 8 9 10 11 "डीपीआर तैयार: सेना के लिए चीन सीमा तक अलग से बिछेगा 13 किलोमीटर रेल ट्रैक". Amar Ujala. Retrieved 14 September 2022.
  3. 1 2 3 4 5 6 7 "New Rail Lines for Leh-Pathankot, Leh-Kargil-Srinagar Shelved Due to Low Traffic Projections". News18. 29 July 2023. Retrieved 27 March 2024.
  4. 1 2 "Leh? Soon, It'll Be Just a Train Ride Away". Outlook Traveller. Archived from the original on 1 November 2018. Retrieved 31 October 2018.
  5. "Bhanupli Railway Station Timeline - Railway Enquiry".
  6. "Himachal: Railways Awards Bhanupali-Bilaspur Railway Line Project". Nvonews.com. 19 September 2009. Archived from the original on 7 April 2012. Retrieved 2 April 2012.
  7. "Rail link to Leh: Centre seeks Plan panel nod". visitladakh.com. Archived from the original on 12 March 2012. Retrieved 2 April 2012.
  8. "Bilaspur–Manali–Leh Railway". Ladakh Blog. 18 May 2026.
  9. Dutta, S. (12 June 2023). "Bhanupali-Leh Rail Project: A feat of engineering at world's highest peaks". The Times of India.
  10. "Strategic Rail Link to Leh: Why it matters for India's border security". NDTV. 5 January 2024.
  11. "Strategic Railway Lines in Border Areas" (Press release). Press Information Bureau. 14 December 2022.
  12. "Economic windfall expected for Ladakh with Bhanupali-Leh rail link". The Tribune. 10 May 2025.
  13. "India's Leh rail link to be higher than China's Qinghai-Tibet Railway". Mint. 19 August 2023.
  14. Sharma, A. (22 March 2021). "Keylong to get India's first station inside a tunnel". The Indian Express.
  15. Krishnan, M. (14 February 2024). "The Environmental Cost of Himalayan Infrastructure". The Hindu.
  16. 1 2 3 4 5 6 7 8 , Amar Ujala, 24 April 2022.
  17. 1 2 3 4 5 6 7 8 9 10 11 12 India’s costliest rail line will change how we view travel, theweek.in, 13 Apr 2025.
  18. World’s highest railway station to be built in India, Project near China border draws attention, its name is..., News24, 9 Mar 2026.
  19. 1 2 Bilaspur-Manali-Leh Rail Line Gets Green Signal; Land Acquisition Process Begins, The News Himachal, 24 Dec 2024.
  20. "Budget 2012-2013 Speech of Dinesh Trivedi Ministry of Railways. March 14, 2012" (PDF). Archived from the original (PDF) on 24 March 2012. Retrieved 31 March 2012.
  21. "'Manali–Leh railway line project report with Planning Commission'". Himvani.com. 26 December 2010. Archived from the original on 26 February 2020. Retrieved 2 April 2012.
  22. "Bilaspur-Manali-Leh rail line on fast track". The Times of India. 3 December 2016. Archived from the original on 4 December 2016. Retrieved 16 January 2022.
  23. Khosla, Sakshita (27 June 2017). "Train to Leh, Ladakh: Suresh Prabhu lays foundation stone for Bilaspur-Mandi-Leh Rail Line to be built at a cost of Rs 157 cr". India.com. Archived from the original on 29 June 2017. Retrieved 28 June 2017.
  24. "Centre announces final location survey of three railway lines in Arunachal Pradesh". The New Indian Express. PTI. 1 April 2017. Archived from the original on 7 November 2017. Retrieved 16 January 2022.
  25. "Indian Railways' big update on Bilaspur-Manali-Leh line". Money Control.
  26. रेल विकास निगम: भानुपल्ली-बिलासपुर-लेह रेललाइन के लिए बिछने लगा ट्रैक, Amar Ujala, 15 May 2022.
  27. "Land acquisition for strategic rail line begins in Himachal". 9 February 2022.
  28. 1 2 3 "The Srinagar-Kargil-Leh line is a proposed railway line from Srinagar station via the town of Kargil to Leh by Indian Railways. The line was designated a national project on 26 February 2013 - www.Rail-Pass.com". www.rail-pass.com. Retrieved 23 April 2023.
  29. "Centre Drops Srinagar-Kargil-Leh Rail Plan". Kashmir Life.
edit