List of commercial nuclear reactors

(Redirected from List of BWRs)

This is a list of all the commercial nuclear reactors in the world, sorted by country, with operational status. The list only includes civilian nuclear power reactors used to generate electricity for a power grid. All commercial nuclear reactors use nuclear fission. As of May 2025, there are 439 operable power reactors in the world, with a combined electrical capacity of 397.7 GW. Additionally, there are 68 reactors under construction and 108 reactors planned, with a combined capacity of 74 GW and 103 GW, respectively, while 359 more reactors are proposed.[1] For non-power reactors, see List of nuclear research reactors. For fuel plants see List of nuclear reprocessing plants. Where not otherwise specified, all information is sourced from the Power Reactor Information System (PRIS) of the International Atomic Energy Agency (IAEA).[2]

In the following tables, the capacity (expressed in megawatt, MW) refers to the net capacity, or the maximum electricity output under reference ambient conditions, after deducting the losses within the system including the energy transformers.[3]

Argentina

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Atucha[4]1PHWRSiemens-KWUOperation suspended
(under maintenance)
3621 Jun 196824 Jun 1974
2PHWRSiemens-KWUOperational74514 Jul 198127 Jun 2014
3PWRHualong OnePlanned[5]1200
Embalse[6]1PHWRCANDU-6Operational6831 Apr 197420 Jan 1984(2049)[7]
CAREM1PWRCAREM25Under construction258 Feb 2014

Armenia

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Metsamor1PWRVVER-440/V-270Shut down3761 Jul 19696 Oct 197725 Feb 1989
2PWRVVER-440/V-270Operational3751 Jul 19753 May 1980(2036)[8]

Austria

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Zwentendorf1BWRBWR-69 (KWU)Finished; never entered service878Apr 19725 Nov 1978

Bangladesh

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Rooppur1PWRVVER-1200/V-523Under construction108030 Nov 2017[9](2026)[10]
2PWRVVER-1200/V-523Under construction108014 Jul 2018(2027)

Belarus

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ostrovets1PWRVVER-1200/V-491Operational11096 Nov 201310 Jun 2021[11]
2PWRVVER-1200/V-491Operational110924 Apr 20141 Nov 2023[12]
Minsk1PWRVVER-1000Unfinished96319831987
2PWRVVER-1000Unfinished96319831987

Belgium

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
SCK•CEN1PWRWestinghouse (WH) BR-3Decommissioned101 Nov 195710 Oct 196230 Jun 1987
Doel1PWRWH 2 loopsShut down4451 Jul 196915 Feb 197514 Feb 2025
2PWRWH 2 loopsShut down4451 Sep 19711 Dec 197530 Nov 2025
3PWRFramatome 3 loopsShut down10061 Jan 19751 Oct 198223 Sep 2022[13]
4PWRBelgian firms plus WH 3 loopsOperational10391 Dec 19781 Jul 1985(1 Nov 2035)
Tihange1PWRFramatome 3 loopsShut down9621 Jun 19701 Oct 19751 Oct 2025
2PWRFramatome 3 loopsShut down10081 Apr 19761 Jun 198331 Jan 2023[14]
3PWRBelgian firms plus WH 3 loopsOperational10461 Nov 19781 Sep 1985(1 Nov 2035)

Brazil

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Angra1PWRWH 2 loopsOperational6091 May 19711 Jan 1985
2PWRPre-KonvoiOperational12751 Jan 19761 Feb 2001
3PWRPre-KonvoiUnder construction12451 Jun 2010(2028)[15]

Bulgaria

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Kozloduy1PWRVVER-440/V-230Shut down4081 Apr 197028 Oct 197431 Dec 2002
2PWRVVER-440/V-230Shut down4081 Apr 197010 Nov 197531 Dec 2002
3PWRVVER-440/V-230Shut down4081 Oct 197320 Jan 198131 Dec 2006
4PWRVVER-440/V-230Shut down4081 Oct 197320 Jun 198231 Dec 2006
5PWRVVER-1000/V-320Operational10039 Jul 198023 Dec 1988
6PWRVVER-1000/V-320Operational10031 Apr 198230 Dec 1993
7PWRAP1000Planned[16]1150(2033)[16]
8PWRAP1000Planned[16]1150
Belene1PWRVVER-1000/V-320
VVER-1000/V-446B
Unfinished953
1011
1987
2008
2PWRVVER-1000/V-320
VVER-1000/V-446B
Unfinished953
1011
1987
2008

Canada

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Pickering1PHWRCANDU 500AShut down515Jun 196629 Jul 19711 Oct 2024
2PHWRCANDU 500AShut down515Sep 196630 Dec 197131 Dec 1997[17]
3PHWRCANDU 500AShut down515Dec 19671 Jun 197229 Dec 1997
4PHWRCANDU 500AShut down515May 196817 Jun 197331 Dec 2024
5PHWRCANDU 500BOperational516Nov 197410 May 1983(2064)
6PHWRCANDU 500BOperational516Oct 19751 Feb 1984(2064)
7PHWRCANDU 500BOperational516Mar 19761 Jan 1985(2064)
8PHWRCANDU 500BOperational516Sep 197628 Feb 1986(2064)[18]
Darlington1PHWRCANDU 850Operational878Apr 198214 Nov 1992(2052)
2PHWRCANDU 850Operational878Sep 19819 Oct 1990(2050)
3PHWRCANDU 850Operational878Sep 198414 Feb 1993(2053)
4PHWRCANDU 850Operational878Jul 198514 Jun 1993(2053)
5[19]BWRBWRX-300Under construction3008 May 2025[20](2030)
6[19]BWRBWRX-300Planned300
7BWRBWRX-300Planned300
8BWRBWRX-300Planned300
Bruce1PHWRCANDU 791Operational823Jun 19711 Sep 1977(2043)
2PHWRCANDU 791Operational823[21]Dec 19701 Sep 1977(2043)
3PHWRCANDU 750AOperational817Jul 19721 Feb 1978(2064)[22]
4PHWRCANDU 750AOperational817Sep 197218 Jan 1979(2064)
5PHWRCANDU 750BOperational817Jun 19781 Mar 1985(2064)
6PHWRCANDU 750BOperational880[23]Jan 197815 Sep 1984(2064)
7PHWRCANDU 750BOperational817May 197910 Apr 1986(2064)
8PHWRCANDU 750BOperational817Aug 197922 May 1987(2064)
NPD1PHWRCANDUShut down19Jan 19584 Jun 19621 Aug 1987
Douglas Point1PHWRCANDU 200Shut down200Feb 196026 Sep 19684 May 1984
Gentilly1BWRCANDU BLWR 250Shut down250Sep 19661 May 19721 June 1977
2PHWRCANDU-6Shut down635Apr 19741 Oct 198328 Dec 2012
Point Lepreau1PHWRCANDU-6Operational635May 19751 Feb 1983(2041)

China

edit

Cuba

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Juragua1PWRVVER-440/V-318Unfinished44019835 Sep 1992
2PWRVVER-440/V-318Unfinished44019855 Sep 1992

Czech Republic

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Dukovany1PWRVVER-440/V-213Operational4681 Jan 19793 May 1985
2PWRVVER-440/V-213Operational4711 Jan 197921 Mar 1986
3PWRVVER-440/V-213Operational4681 Mar 197920 Dec 1986
4PWRVVER-440/V-213Operational4711 Mar 197919 Jul 1987
5PWRAPR-1000Planned1055
6PWRAPR-1000Planned1055
Temelín1PWRVVER-1000/V-320Operational10031 Feb 198710 Jun 2002
2PWRVVER-1000/V-320Operational10031 Feb 198718 Apr 2003

Egypt

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
El Dabaa1PWRVVER-1200/V-529Under construction120020 Jul 2022[65](2028)
2PWRVVER-1200/V-529Under construction120019 Nov 2022[66]
3PWRVVER-1200/V-529Under construction12003 May 2023[67]
4PWRVVER-1200/V-529Under construction120023 Jan 2024

Finland

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)[68]
Begin
building
Commercial
operation
Closed
Hanhikivi1PWRVVER-1200/V-491Cancelled1200(2023)(2029)2 May 2022[69][70]
Loviisa1PWRVVER-440/V-213Operational5071 May 19719 May 1977
2PWRVVER-440/V-213Operational5071 Aug 19725 Jan 1981
Olkiluoto1BWRASEA-III, BWR-2500Operational8901 Feb 197410 Oct 1979
2BWRASEA-III, BWR-2500Operational8901 Nov 197510 Jul 1982[71]
3PWREPROperational160012 Aug 20051 May 2023[72]

France

edit

Germany

edit

Hungary

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Paks1PWRVVER-440/V-213Operational4701 Aug 197410 Aug 1983
2PWRVVER-440/V-213Operational4731 Aug 197414 Nov 1984
3PWRVVER-440/V-213Operational4731 Oct 19791 Dec 1986
4PWRVVER-440/V-213Operational4711 Oct 19791 Nov 1987
5PWRVVER-1200Under construction11145 Feb 2026[78]
6PWRVVER-1200Planned1114(2026)

India

edit

Iran

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bushehr1PWRVVER-1000/V-446Operational9151 May 197523 Sep 2013
2PWRVVER-1000/V-528Under construction91527 Sep 2019
3PWRVVER-1000Planned915
Darkhovin1PWRUnfinished; restart planned360

Italy

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Caorso1BWRBWR-4 Mark2Shut down/in decommissioning8601 Jan 19701 Dec 19811 Jul 1990
Enrico Fermi1PWRWH 4-loopShut down/in decommissioning2601 Jul 19611 Jan 19651 Jul 1990
Garigliano1BWRBWR-1Shut down/in decommissioning1501 Nov 19591 Jun 19641 Mar 1982
Latina1GCRMagnoxShut down/in decommissioning1531 Nov 19581 Jan 19641 Dec 1987
Montalto1BWRUnfinished9821 Jul 19821 Jan 1988
2BWRUnfinished9821 Jul 19821 Jul 1988
Trino 2 [IT]1PWRUnfinished95023 Dec 1987
2PWRUnfinished95023 Dec 1987

Japan

edit

Kazakhstan

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Aktau1FBRBN-350Shut down/in decommissioning3501 Oct 196416 Jul 197322 Apr 1999

Lithuania

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ignalina1LWGRRBMK-1500Shut down/in decommissioning11851 May 197731 Dec 198331 Dec 2004
2LWGRRBMK-1500Shut down/in decommissioning11851 Jan 1978Aug 198731 Dec 2009
3LWGRRBMK-1500Unfinished1185

Mexico

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Laguna Verde1BWRBWR-5Operational8041 Oct 197628 Jul 1990
2BWRBWR-5Operational8001 Jun 197710 Apr 1995

Netherlands

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Borssele1PWRKWU 2LPOperational4821 Jul 196926 Oct 1973(2033)
Dodewaard1BWRBWR-2Shut down551 May 196526 Mar 196926 Mar 1997

North Korea

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Yongbyon1GCRMagnox (Pu-production)Shut down[citation needed]5[citation needed]1994
2LWR[92]Pre-operational testing[93]30
Taechon1Unfinished2001994
Kumho1PWRUnfinished10002003
2PWRUnfinished10002003

Pakistan

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Chashma1PWRCNP-300Operational3001 Aug 199315 Sep 2000
2PWRCNP-300Operational30028 Dec 200518 May 2011
3PWRCNP-300Operational31528 May 20116 Dec 2016
4PWRCNP-300Operational31318 Dec 201119 Sep 2017
5PWRHualong OneUnder construction110030 Dec 2024
Karachi1PHWRCANDUShut down901 Aug 19667 Dec 19721 Aug 2021
2PWRHualong OneOperational101423 May 201319 Mar 2021[94]
3PWRHualong OneOperational101431 May 201618 Apr 2022

Philippines

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Bataan1PWRWestinghouseUnfinished; restart planned[95]62119761986

Poland

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Żarnowiec1PWRVVER-440Unfinished44031 Mar 19824 Sep 1990
2PWRVVER-440Unfinished44031 Mar 19824 Sep 1990
3 PWR VVER-440 Cancelled 440
4 PWR VVER-440 Cancelled 440
Lubiatowo-Kopalino[96]1PWRAP1000Planned1250[97](2026)(2033)[98]
2PWRAP1000Planned1250(2035–2036)[98]
3PWRAP1000Planned1250(2037–2039)[98]
Pątnów[99]1PWRAPR-1400Planned1340
2PWRAPR-1400Planned1340
Włocławek1BWRBWRX-300Planned300(2030)[100]
Ostrołęka1BWRBWRX-300Planned300(2030)[100]
Warsaw1BWRBWRX-300Planned300(2030)[100]
Tarnobrzeg/Stalowa Wola1BWRBWRX-300Planned300(2030)[100]
Dąbrowa Górnicza1BWRBWRX-300Planned300(2030)[100]
Stawy Monowskie1BWRBWRX-300Planned300(2030)[100]
Kraków1BWRBWRX-300Planned300(2030)[100]

Romania

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Cernavodă1PHWRCANDU-6Operational65031 Mar 19832 Dec 1996
2PHWRCANDU-6Operational6501 Jul 19831 Nov 2007
3PHWRCANDU-6Unfinished; restart planned650
4PHWRCANDU-6Unfinished; restart planned650
5PHWRCANDU-6Unfinished650

Russia

edit

Slovakia

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
BohuniceA-1[120]HWGCRKS 150Decommissioned931 Aug 195825 Dec 197222 Feb 1977
1[121]PWRVVER-440/V-230Shut down40824 Apr 19721 Apr 198031 Dec 2006
2PWRVVER-440/V-230Shut down40824 Apr 19721 Jan 198131 Dec 2008
3PWRVVER-440/V-213Operational4721 Dec 197614 Feb 1985(2045)
4PWRVVER-440/V-213Operational4711 Dec 197618 Dec 1985(2045)
Mochovce1PWRVVER-440 V-213Operational43613 Oct 198329 Oct 1998(2058)
2PWRVVER-440/V-213Operational43613 Oct 198311 Apr 2000(2060)
3PWRVVER-440/V-213Operational44027 Jan 198717 Oct 2023[122]
4PWRVVER-440/V-213Under construction44027 Jan 1987

Slovenia

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Krško1PWRWH 2 loopsOperational68830 Mar 19751 Jan 1983(2043)[123]
2PWRTBDPlanned1100(2030)[124]

South Africa

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Koeberg1PWRCP1 (France)Operational9301 Jul 197621 Jul 1984
2PWRCP1 (France)Operational9301 Jul 19769 Nov 1985

South Korea

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
(planned)
Closed
Hanbit1PWRWH FOperational9604 Jun 198125 Aug 1986
2PWRWH FOperational95810 Dec 198110 Jun 1987
3PWROPR-1000Operational99723 Dec 198931 Mar 1995
4PWROPR-1000Operational99726 May 19901 Jan 1996
5PWROPR-1000Operational99729 Jun 199721 May 2002
6PWROPR-1000Operational99520 Nov 199724 Dec 2002
Hanul1PWRCP1 (France)Operational96026 Jan 198310 Sep 1988
2PWRCP1 (France)Operational9625 Jul 198330 Sep 1989
3PWROPR-1000Operational99421 Jul 199311 Aug 1998
4PWROPR-1000Operational9981 Nov 199331 Dec 1999
5PWROPR-1000Operational9961 Oct 199929 Jul 2004
6PWROPR-1000Operational99629 Sep 200022 Apr 2005
Shin-Hanul1PWRAPR-1400Operational134010 Jul 20127 Dec 2022[125]
2PWRAPR-1400Operational134019 Jul 20125 Apr 2024[126]
3PWRAPR-1400Under construction[127]134020 May 2025(2032)
4PWRAPR-1400Under construction[128]134029 May 2026(2033)
Kori1PWRWH 60Shut down57627 Apr 197229 Apr 197818 Jun 2017
2PWRWH FOperational6404 Dec 197725 Jul 1983
3PWRWH FOperational10111 Oct 197930 Sep 1985
4PWRWH FOperational10121 Apr 198029 Apr 1986
Shin-Kori1PWROPR-1000Operational99616 Jun 200628 Feb 2011
2PWROPR-1000Operational9965 Jun 200720 Jul 2012
Saeul1PWRAPR-1400Operational141616 Oct 200815 Jan 2016
2PWRAPR-1400Operational141819 Aug 200929 Aug 2019[129]
3PWRAPR-1400Under construction14001 Apr 2017
4PWRAPR-1400Under construction140020 Sep 2018
Wolsong1PHWRCANDU-6Shut down65730 Oct 197722 Apr 198324 Dec 2019
2PHWRCANDU-6Operational65522 Jun 19921 Jul 1997
3PHWRCANDU-6Operational68417 Mar 19941 Jul 1998
4PHWRCANDU-6Operational68822 Jul 19941 Oct 1999
Shin-Wolsong1PWROPR-1000Operational99120 Nov 200731 Jul 2012
2PWROPR-1000Operational96023 Sep 200826 Feb 2015

Spain

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Almaraz1PWRWH 3 loopsOperational10113 Jul 19731 Sep 1983
2PWRWH 3 loopsOperational10063 Jul 19731 Jul 1984
Ascó1PWRWH 3 loopsOperational99516 May 197410 Dec 1984
2PWRWH-3 loopsOperational9977 Mar 197531 Mar 1986
Cofrentes1BWRBWR-6Operational10649 Sep 197511 Mar 1985
José Cabrera1PWRWH 1 loopShut down/in decommissioning14124 Jun 196413 Aug 196930 Apr 2006
Lemoniz1PWRUnfinished19721984
2PWRUnfinished19721984
Santa María de Garoña1BWRBWR-3Shut down/in decommissioning44611 May 197115 Feb 19756 Jul 2013
Trillo1PWRKWU 3 loopsOperational100317 Aug 19796 Aug 1988
Valdecaballeros1BWRUnfinished19751984
2BWRUnfinished19751984
Vandellòs1GCRUNGGShut down/in decommissioning48019672 Aug 197231 Jul 1990
2PWRWH 3 loopsOperational104529 Dec 19808 Mar 1988

Sweden

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Ågesta1PHWRR3Shut down/in decommissioning101 Dec 19571 May 19642 Jun 1974[a]
Barsebäck1BWRASEA-IIShut down/in decommissioning6001 Feb 19711 Jul 197530 Nov 1999[b]
2BWRASEA-IIShut down/in decommissioning6001 Jan 19731 Jul 197731 May 2005[c]
Forsmark1BWRASEA-III, BWR-2500Operational9861 Jun 197310 Dec 1980[d]
2BWRASEA-III, BWR-2500Operational11161 Jan 19757 Jul 1981[e]
3BWRASEA-IV, BWR-3000Operational11671 Jan 197918 Aug 1985[f]
Oskarshamn1BWRASEA-IShut down/in decommissioning4731 Aug 19666 Feb 197219 Jun 2017[g]
2BWRASEA-IIShut down/in decommissioning6381 Sep 19691 Jan 197522 Dec 2016[h]
3BWRASEA-IV, BWR-3000Operational14501 May 198015 Aug 1985[i]
Marviken1BHWRR4Unfinished1961 Apr 196527 May 1970[j]
Ringhals1BWRASEA-IShut down/in decommissioning8811 Feb 19691 Jan 197631 Dec 2020[k]
2PWRWH 3-loopsShut down/in decommissioning9041 Oct 19701 May 197530 Dec 2019[l]
3PWRWH 3-loopsOperational10621 Sep 19729 Sep 1981[m]
4PWRWH 3-loopsOperational11041 Nov 197321 Nov 1983[n]

Switzerland

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed[135]
Beznau1PWRWH 2-loopsOperational3651 Sep 19651 Sep 1969(2029)
2PWRWH 2-loopsOperational3651 Jan 19681 Dec 1971(2031)
Gösgen1PWRKWU 3-loopsOperational10101 Dec 19731 Nov 1979
Leibstadt1BWRBWR-6Operational12201 Jan 197415 Dec 1984
Lucens1HWGCRHWGCRDecommissioned61 Apr 196229 Dec 196621 Jan 1969
Mühleberg1BWRBWR-4Shut down/in decommissioning3731 Mar 19676 Nov 197220 Dec 2019

Taiwan

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Jinshan1BWRBWR-4Shut down/in decommissioning6362 Jun 197210 Dec 19783 Oct 2018
2BWRBWR-4Shut down/in decommissioning6367 Dec 197315 Jul 19793 Oct 2018
Kuosheng1BWRBWR-6Shut down98519 Nov 197528 Dec 19811 Jul 2021[136]
2BWRBWR-6Shut down98515 Mar 197616 Mar 198315 Mar 2023
Lungmen1BWRABWRUnfinished135031 Mar 199927 April 2014 [137]
2BWRABWRUnfinished135030 Aug 199927 April 2014 [137]
Maanshan1PWRWH 312 3-loopShut down95121 Aug 197827 Jul 198428 Jul 2024
2PWRWH 312 3-loopShut down95121 Feb 197918 May 198517 May 2025

Turkey

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Akkuyu1PWRVVER-1200Under construction11143 Apr 2018(2026)[138]
2Under construction11148 Apr 2020(2027)
3Under construction111410 Mar 2021(2027)
4Under construction111421 Jul 2022[139](2028)
Sinop1PWRAPR+Planned1120(2035)[140]
2Planned1120
3Planned1120
4Planned1120
Thracian1PWRCAP1400Planned1500(2040)[141]
2Planned1500
3Planned1500
4Planned1500

Ukraine

edit

United Arab Emirates

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Barakah1PWRAPR-1400Operational134519 Jul 20126 Apr 2021[146]
2PWRAPR-1400Operational134516 Apr 201324 Mar 2022[147]
3PWRAPR-1400Operational134524 Sep 201424 Feb 2023[148]
4PWRAPR-1400Operational134530 Jul 20155 Sep 2024[149]

United Kingdom

edit

United States

edit

Uzbekistan

edit
Plant
name
Unit
No.
Type Model Status Capacity
(MW)
Begin
building
Commercial
operation
Closed
Plant in the Jizzakh Region[170]1PWRRITM-200NUnder construction5524 Mar 2026
2PWRRITM-200NUnder construction5524 Mar 2026
3 PWR VVER-1000 Planned 930
4 PWR VVER-1000 Planned 930

See also

edit

Notes

edit
  1. The full reactor model name is R3/Adam.[130]
  2. The full reactor model name is ASEA-ATOM Gen II.[131]
  3. The full reactor model name is ASEA-ATOM Gen II.[131]
  4. The full reactor model name is ASEA-ATOM Gen III,[131] BWR-2500,[131] BWR 69.[132]
  5. The full reactor model name is ASEA-ATOM Gen III,[131] BWR-2500,[131] BWR 69.[132]
  6. The full reactor model name is ASEA-ATOM Gen IV,[131] BWR-3000,[131] BWR 75.[132]
  7. The full reactor model name is ASEA-ATOM Gen I.[131]
  8. The full reactor model name is ASEA-ATOM Gen II.[131]
  9. The full reactor model name is ASEA-ATOM Gen IV,[131] BWR-3000,[131] BWR 75.[133]
  10. The full reactor model name is R4/Eva. Construction date is approximate. Data are from Swedish Radiation Safety Authority.[130]
  11. The full reactor model name is ASEA-ATOM Gen I.[131] Closed at midnight on New Year's Eve.[134]
  12. The full reactor model name is Westinghouse 3-loops.[131]
  13. The full reactor model name is Westinghouse 3-loops.[131]
  14. The full reactor model name is Westinghouse 3-loops.[131]

References

edit
  1. "World Nuclear Power Reactors & Uranium Requirements". world-nuclear.org. World Nuclear Association. Retrieved 5 May 2020.
  2. "PRIS – Home". pris.iaea.org.
  3. "Reference Unit Power" at IAEA
  4. "Nuclear Power in Argentina | Argentinian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 4 August 2019.
  5. "China inks $8 bln nuclear power plant deal in Argentina". Reuters. 2 February 2022. Retrieved 2 February 2022.
  6. Yulia Kosarenko. "NASA fact sheet". Archived from the original on 8 July 2007. Retrieved 20 August 2015.
  7. "The Embalse Nuclear Power Plant returns to service for a new cycle of 30 years". BNamericas.com.
  8. "Metsamor 2 to operate until 2036 : Corporate – World Nuclear News".
  9. "Nuclear Power in Bangladesh – World Nuclear Association". world-nuclear.org. Retrieved 17 July 2018.
  10. "Лихачев рассказал, когда запустят первый энергоблок АЭС "Руппур"". РИА Новости (in Russian). 21 August 2025. Archived from the original on 21 August 2025. Retrieved 15 October 2025.
  11. "Росатом Госкорпорация "Росатом" ядерные технологии атомная энергетика АЭС ядерная медицина". rosatom.ru.
  12. "Second Belarus unit enters commercial operation". world-nuclear-news.org.
  13. "Doel 3: Shutdown confirmed for Friday". RTBF Info. 23 September 2022. Retrieved 25 September 2022.
  14. "Second Belgian reactor enters retirement : Corporate - World Nuclear News".
  15. 1 2 3 "Plans for New Nuclear Reactors Worldwide - World Nuclear Association".
  16. 1 2 3 "Bulgaria to push ahead with two new units at Kozloduy". world-nuclear-news.org. World Nuclear News. 25 October 2023. Retrieved 3 November 2023.
  17. "Utility abandons Pickering reactor overhaul". The Globe and Mail. 13 August 2005.
  18. "Pickering refurbishment gets government go-ahead". World Nuclear News. 27 November 2025. Retrieved 25 February 2026.
  19. 1 2 Patel, Sonal (2 December 2021). "Darlington Nuclear Plant Will Get a BWRX-300 SMR as GE Hitachi Bags Lucrative OPG Selection". POWER Magazine. Retrieved 5 December 2021.
  20. https://www.world-nuclear-news.org/articles/opg-gets-go-ahead-to-build-first-smr-in-canada
  21. "Unit 2 sets record run ahead of planned maintenance outage". brucepower.com. 6 May 2022. Retrieved 7 July 2023.
  22. "Life-Extension Program & MCR Project". brucepower.com. Retrieved 7 July 2023.
  23. "Bruce 6 re-enters commercial operation : Corporate - World Nuclear News".
  24. 1 2 "China / Construction Begins of Two Hualong One Reactors at Changjiang". The Independent Global Nuclear News Agency. Retrieved 28 November 2019.
  25. 1 2 "我国自主三代核电华龙一号在海南正式开工建设". CNNC. Retrieved 2 April 2021.[permanent dead link]
  26. "China's first Hualong One nuclear reactor starts commercial operations". Reuters. 30 January 2021. Retrieved 30 January 2021.
  27. "Second Fuqing Hualong One enters commercial operation: New Nuclear – World Nuclear News".
  28. "Second AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  29. "Fourth Chinese AP1000 enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 13 January 2019.
  30. "Construction starts on third Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 25 July 2022.
  31. "Construction begins of fourth Haiyang unit". World Nuclear News. World Nuclear Association. Retrieved 26 April 2023.
  32. "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 16 July 2018.
  33. "Fifth Hongyanhe unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 2 August 2021.
  34. "China Nuclear Power | Chinese Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 15 June 2018.
  35. "Construction of Lufeng 5 gets under way". World Nuclear News. World Nuclear Association. Retrieved 9 September 2022.
  36. "Construction of Lufeng 6 begins". World Nuclear News. World Nuclear Association. Retrieved 29 August 2023.
  37. "Construction of new Chinese power plant begins: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 5 January 2021.
  38. "First San'ao unit connected to the grid". World Nuclear News. World Nuclear Association. 13 March 2026. Retrieved 14 March 2026.
  39. "First concrete for unit 2 of China's San'ao nuclear power project- Nuclear Engineering International". Retrieved 4 January 2022.
  40. "First AP1000 reactor enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 24 October 2018.
  41. "Sanmen 2 AP1000 enters commercial operation – World Nuclear News". world-nuclear-news.org. Retrieved 7 November 2018.
  42. "PRIS – Reactor Details". pris.iaea.org. Retrieved 8 July 2022.
  43. "Construction starts on fourth Sanmen unit". world-nuclear-news.org. Retrieved 23 March 2023.
  44. "China's demonstration HTR-PM enters commercial operation : New Nuclear - World Nuclear News".
  45. "Shidaowan Guohe One 1".
  46. "Shidaowan Guohe One 2".
  47. "Shidaowan 1".
  48. "Taipingling 1 connected to the grid". World Nuclear News. 16 February 2026. Retrieved 18 February 2026.
  49. 1 2 "China approves first new nuclear reactors in 3-plus years". Nikkei Asian Review. Retrieved 2 August 2019.
  50. https://www.world-nuclear-news.org/articles/construction-begins-on-fourth-taipingling-unit
  51. "EDF : le premier des 2 EPR de la centrale de Taishan (Chine) entre en exploitation commerciale". Capital.fr (in French). 14 December 2018. Retrieved 14 December 2018.[permanent dead link]
  52. "World's second EPR starts operations". Retrieved 10 September 2019.
  53. "Fourth Tianwan unit enters commercial operation". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  54. "Fifth Tianwan unit starts commercial operation". World Nuclear News. World Nuclear Association. Retrieved 9 September 2020.
  55. "Tianwan 6 enters commercial operation : New Nuclear - World Nuclear News".
  56. "Construction starts on eighth Tianwan unit: New Nuclear – World Nuclear News".
  57. "Fast nuclear reactor to start construction in Fujian in 2017". 16 August 2015. Archived from the original on 17 August 2015. Retrieved 16 August 2015.
  58. "China starts building second CFR-600 fast reactor: New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 30 December 2020.
  59. "Work on Xudabao unit 1 gets under way". world-nuclear-news.org. Retrieved 17 November 2023.
  60. "Дан старт сооружению новых блоков российского дизайна атомных станций "Тяньвань" и "Сюйдапу" (Китай)". ruscable.ru.
  61. "Construction of Xudapu 4 under way: New Nuclear – World Nuclear News".
  62. "Yangjiang 5 enters commercial operation". world-nuclear-news.org. Retrieved 16 July 2018.
  63. "Construction starts on first Zhangzhou unit – World Nuclear News". world-nuclear-news.org. Retrieved 18 October 2019.
  64. "World's largest Hualong One nuclear power base successfully connects to State Grid". Retrieved 23 November 2025.
  65. "Construction of Egypt's first nuclear power plant under way : New Nuclear – World Nuclear News".
  66. "PRIS – Reactor Details".
  67. "Construction begins of third unit at Egypt's el Dabaa nuclear power plant : New Nuclear - World Nuclear News".
  68. "Nuclear power plants in Finland". STUK. 6 April 2021. Retrieved 13 May 2022.
  69. "Fennovoima cancels Hanhikivi 1 contract with Russia". World Nuclear Association. 3 May 2022.
  70. "Fennovoima terminates contract for Hanhikivi 1 NPP construction". TASS. 2 May 2022.
  71. "PRIS – Reactor Details".
  72. "Faulty seals replaced in Olkiluoto EPR : Regulation & Safety - World Nuclear News".
  73. https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=873
  74. "EDF begins permitting process for two new reactors at Penly : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 9 December 2023.
  75. 1 2 "Germany shuts three of its last six nuclear plants". Retrieved 1 January 2022.
  76. "German reactor permanently shut down". world-nuclear-news.org. Retrieved 10 May 2018.
  77. "Germany shuts down Philippsburg 2". energycentral.com. Retrieved 8 January 2020.
  78. "First concrete poured for Hungary's Paks II nuclear project". world-nuclear-news.org. 5 February 2026. Retrieved 8 February 2026.
  79. "PRIS – Reactor Details".
  80. "Genkai unit 4 supplying power again". world-nuclear-news.org. Retrieved 22 June 2018.
  81. 1 2 3 4 5 6 7 "Licensing status for the Japanese nuclear facilities – Japan Nuclear Safety Institute". genanshin.jp. Retrieved 3 October 2021.
  82. "東通原子力発電所1号機の着工について". Tokyo Electric Power Company Holdings, Inc. Retrieved 27 June 2023.
  83. "柏崎刈羽原発6号機が再稼働 東電の原発としては事故後初". NHK. Retrieved 21 January 2026.
  84. "Nuclear Power Plants in Japan – The Federation of Electric Power Companies of Japan(FEPC)". fepc.or.jp. Retrieved 8 May 2018.
  85. "40年超の美浜原発3号機が再稼働 原発事故後 全国初". NHK. Retrieved 23 June 2021.{{cite news}}: CS1 maint: deprecated archival service (link)
  86. "Ohi No.4 reactor restarted- News – NHK WORLD – English". NHK WORLD. Archived from the original on 10 May 2018. Retrieved 10 May 2018.
  87. "Japan's Tohoku Elec restarts Onagawa reactor after 13-year hiatus – Reuters". Reuters. Retrieved 29 October 2024.
  88. "運転開始40年超高浜原発1号機 約12年ぶりに再稼働". Archived from the original on 28 July 2023. Retrieved 28 July 2023.
  89. "Takahama 2 reactor restarted". Retrieved 15 September 2023.
  90. "Japan approves extension for reactor similar to Fukushima units that melted down – Reuters". Reuters. Retrieved 29 December 2019.
  91. https://www.japantimes.co.jp/news/2025/04/30/japan/tomari-nuclear-plant-restart-approved
  92. "North Korea's Yongbyon Nuclear Facility: Slow Progress at the Experimental Light Water Reactor". 38 North. U.S.-Korea Institute, Johns Hopkins University School of Advanced International Studies. 14 January 2016. Archived from the original on 9 April 2016. Retrieved 4 April 2016.
  93. Makowsky, Peter; Liu, Jack; Ragnone, Iliana (23 May 2024). "Yongbyon Nuclear Scientific Research Center: Construction at the Radiochemical Laboratory". 38 North. The Henry L. Stimson Center. Retrieved 5 April 2026.
  94. "PRIS - Reactor Details".
  95. "Philippines relaunches nuclear energy programme : Nuclear Policies". World Nuclear News. 3 March 2022. Retrieved 29 April 2022.
  96. "Najważniejsze informacje – Polskie Elektrownie Jądrowe". pej.pl. Retrieved 15 February 2026.
  97. "Poland's government confirms Westinghouse for nuclear plant". 4 November 2022.
  98. 1 2 3 "Poland's Westinghouse choice 'deepens strategic relationship' with USA". 31 October 2022.
  99. "South Korea's KHNP signs letter of intent on Polish nuclear". 31 October 2022.
  100. 1 2 3 4 5 6 7 "Taki reaktor chcą zbudować Orlen i Synthos". 18 April 2023.
  101. "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
  102. "Nuclear Power in Russia | Russian Nuclear Energy – World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
  103. "Кольскую АЭС-2 начнут строить в 2028 году". Retrieved 9 December 2023.
  104. "Kursk's second unit retires after 45 years operation". Retrieved 31 January 2024.
  105. "First Kursk II unit connected to the grid". world-nuclear-news.org. Retrieved 2 January 2026.
  106. "Новак рассказал о сроках запуска первых двух блоков новой Курской АЭС-2". ПРАЙМ (in Russian). 11 September 2025. Retrieved 15 October 2025.
  107. "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
  108. "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  109. "Four New NPP Units Will be Built in Russia".
  110. "Ленинградской атомной станции добавят мощности". 15 March 2024.
  111. "На энергоблоке №4 Ленинградской АЭС-2 приступили к бетонированию фундамента реактора". neftegaz.ru (in Russian). 20 March 2025. Retrieved 21 March 2025.
  112. "Russia commits to further floating NPPs : New Nuclear – World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
  113. ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.
  114. "Russia plans new generation of FNPPS – Nuclear Engineering International". 6 January 2021.
  115. 1 2 "Заложен корпус первого плавучего энергоблока в арктическом исполнении на базе реакторов РИТМ-200 – Атомэнергомаш". aem-group.ru. Archived from the original on 30 August 2022. Retrieved 30 August 2022.
  116. "В Якутии собираются строить АЭС мощностью не менее 55 МВт".
  117. ""Росатом" начал строительство реактора Брест-300 в Северске". 8 June 2021.
  118. "Russia prepares to build new nuclear reactors at Leningrad and Smolensk – Nuclear Engineering International". 26 June 2020.
  119. "VVER units planned for Leningrad and Smolensk".
  120. Shut down after a 1977 refuelling incident; decommission in progress since 1979
  121. "Tlačová agentúra Slovenskej republiky – TASR.sk". tasr.sk. Archived from the original on 20 January 2009.
  122. "Power commissioning of Mochovce 3 completed".
  123. "Krško gets an overhaul : Corporate – World Nuclear News".
  124. "Drugi blok NE Krško prve megavate mogao bi dati nakon 2030" [The second block of NPP Krško could provide the first megawatts after 2030.]. Točka na I (in Croatian). 30 November 2022. Retrieved 14 April 2023.
  125. "South Korean APR-1400 starts commercial operation : New Nuclear - World Nuclear News".
  126. "Unit 2 at South Korean nuclear reactor enters commercial operation". 9 April 2024.
  127. https://www.world-nuclear-news.org/articles/construction-of-new-korean-reactor-begins
  128. https://www.world-nuclear-news.org/articles/construction-starts-for-shin-hanul-unit-4
  129. "Second APR-1400 unit starts commercial operation". world-nuclear-news.org. Retrieved 3 September 2019.
  130. 1 2 "Marvikenreaktorn - ett industripolitiskt utvecklingsprojekt i otakt med tiden". The Swedish Radiation Safety Authority (in Swedish). 31 March 2007. Retrieved 12 January 2023.
  131. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 "IAEA Sweden reactors". IAEA. 11 January 2023. Retrieved 12 January 2023.
  132. 1 2 3 "Forsmarks reaktorer i siffror" (PDF). Vattenfall (in Swedish). April 2016. Retrieved 12 January 2023.
  133. "MILSTOLPAR I VÅR HISTORIA". Westinghouse (in Swedish). Retrieved 12 January 2023.
  134. "Ringhals 1 inne på slutspurten". SVT (in Swedish). 26 October 2020. Retrieved 29 December 2020.
  135. admin.ch, The Federal Authorities, Federal Council decides to gradually phase out nuclear energy as part of its new energy strategy Archived 20 June 2013 at the Wayback Machine, 25 May 2011
  136. "Early shutdown for Taiwanese reactor : Corporate". World Nuclear News. 1 July 2021. Retrieved 29 April 2022.
  137. 1 2 "封存核四 馬英九:為下一代保留選擇權". 自由時報電子報 (in Chinese (Taiwan)). 27 April 2014. Retrieved 8 November 2024. 馬英九總統、閣揆江宜樺下午邀集黨籍縣市首長舉行會議,會後國民黨發言人范姜泰基轉述,今日會議達成兩點共識,分別是「核四一號機不施工、只安檢,安檢後封存;核四二號機全部停工」,以及「行政院承諾儘速召開全國能源會議,以確保未來供電無虞」。
  138. "Власти Турции заявили о планах запуска первого реактора на АЭС "Аккую" в 2026 г."
  139. "Construction begins of fourth Turkish reactor : New Nuclear – World Nuclear News".
  140. https://bigpara.hurriyet.com.tr/haberler/ekonomi-haberleri/sinop-ve-trakya-nukleer-santralleri-icin-tarih-belli-oldu_ID1614158/
  141. https://www.indyturk.com/node/761114/haber/enerji-bakanl%C4%B1%C4%9F%C4%B1-yetkilisi-a%C3%A7%C4%B1klad%C4%B1-yeni-n%C3%BCkleer-santraller-yolda
  142. "В Україні збудують нову атомну станцію: названо місто будівництва". GSMinfo. 22 September 2022. Retrieved 9 December 2023.
  143. "На Хмельницькій АЕС відбулася нарада з питань будівництва 3 та 4 енергоблоків". xaec.org.ua. 12 February 2021. Archived from the original on 24 February 2021. Retrieved 7 November 2022.
  144. "Ukraine begins construction of new units at Khmelnitsky NPP". 17 April 2024.
  145. 1 2 3 "Is it sensible to invest in the construction of new nuclear reactors during post-war reconstruction? – Ecoclub Rivne is an environmental NGO".
  146. "UAE's first nuclear power plant begins commercial operations". Reuters. 6 April 2021. Retrieved 6 April 2021.
  147. "Barakah / Unit 2 Begins commercial operations at Arab World's First Nuclear Station :: NucNet | the Independent Nuclear News Agency". 23 February 2022.
  148. "Third Barakah unit begins commercial operation : New Nuclear - World Nuclear News".
  149. "UAE Celebrates Historic Milestone as Unit 4 of the Barakah Plant Commences Commercial Operation: Delivering Full-fleet Operations". 5 September 2024.
  150. 1 2 3 4 5 6 7 8 Ambrose, Jillian (4 December 2024). "Four of UK's oldest nuclear plants to run for even longer as Hinkley Point delayed". Retrieved 4 December 2024.
  151. "Hinkley Point B enters retirement : Corporate – World Nuclear News". world-nuclear-news.org. Retrieved 2 August 2022.
  152. "PRIS – Reactor Details". pris.iaea.org. Retrieved 25 July 2022.
  153. "Hunterston B nuclear power station retires after 46 years in service". The Guardian. 7 January 2022.
  154. "PRIS – Reactor Details". pris.iaea.org. Retrieved 24 January 2019.
  155. "Wylfa nuclear power plant plans go ahead, creating Anglesey jobs". www.bbc.com. 13 November 2025. Retrieved 13 November 2025.
  156. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  157. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  158. "PRIS – Reactor Details". iaea.org. Retrieved 11 May 2018.
  159. "Brunswick-1". IAEA. Retrieved 14 April 2013.
  160. "Brunswick-2". IAEA. Retrieved 14 April 2013.
  161. "Scaled down SMR pilot project remains on course : New Nuclear". World Nuclear News. 23 July 2021. Retrieved 29 April 2022.
  162. "Idaho SMR project terminated". World Nuclear News. 9 November 2023. Retrieved 9 November 2023.
  163. 1 2 3 4 "TVA Prepares to Write Final Nuclear Chapters". American Nuclear Society. 17 April 2015. Archived from the original on 29 July 2023. Retrieved 5 October 2023.
  164. 1 2 3 4 5 6 7 8 Tennessee Valley Authority. "Hartsville Nuclear Plant Site, Transfer of TVA Property For Industrial Park" (PDF). Archived from the original (PDF) on 5 January 2009. Retrieved 5 October 2023.
  165. 1 2 "Entergy's Indian Point Unit 2 to Shut Down Permanently". Indian Point Energy Center. 29 April 2020. Archived from the original on 3 August 2020. Retrieved 30 April 2020.
  166. "PRIS – Reactor Details".
  167. StarTribune.com, WILSON RING Vermont Yankee nuclear power plant ends operations after 42 years of producing electricity Archived 29 December 2014 at the Wayback Machine, 29 Dec 2014
  168. "Vogtle Unit 3 goes into operation". Cision. 31 July 2023. Retrieved 31 July 2023.
  169. "Commercial operation marks completion of Vogtle expansion : New Nuclear - World Nuclear News".
  170. ""Росатом" начал заливку бетона на АЭС в Узбекистане". interfax.ru. 24 March 2026. Retrieved 27 March 2026.
edit